• : 630-595-5150
  • : admin@atcri.com
  • Home
  • About Us
  • Products
  • Tools and Forms
  • Request a Quote
  • Contact Us
  • Customer Login
  • Hiring Sales Reps

Turbine Outage & Turnaround Insulation Services

Advanced Thermal Corp > Steam & Gas Turbine Removable Insulation Blankets > Turbine Outage & Turnaround Insulation Services

Turbine Outage & Turnaround Insulation Services

Power Plant Turbine Outage & Turnaround Insulation Services

Power Plant Turbine Outage and Turnaround Insulation Replacement Services

Advanced Thermal Corp. (ATC) delivers specialized, fast-response turbine outage insulation and turnkey outage insulation services for simple-cycle, combined-cycle, and steam generation power plants across North America. As a trusted turbine outage insulation contractor, we support planned turnarounds, Combustion Inspections (CI), Hot Gas Path (HGP) overhauls, Major Inspections, and emergency forced outages with precision replacement blankets and on-site technical support.

When unexpected insulation damage threatens your critical path, ATC eliminates schedule slip with emergency 24-to-48 hour custom insulation blanket fabrication, digital laser templating, and guaranteed drop-in OEM replacements. From heavy-frame gas turbines (GE 7F/9F, Siemens 501F) to aeroderivatives (LM6000, LM2500, LMS100) and high-pressure steam turbines, we ensure fast, safe, and compliant recommissioning.

Request Rapid Outage Support >>

Comprehensive Outage & Turnaround Insulation Capabilities

During power plant turnarounds, insulation is frequently the last discipline scheduled but the first to trigger critical path delays. Damaged, oil-soaked, or brittle blankets discovered during casing unbolting can halt reassembly. ATC provides end-to-end power plant outage insulation solutions engineered to protect outage timelines:

  • Turbine Insulation Removal & Safe Laydown: Careful unlacing and systematic removal of blanket sets to prevent tearing or hardware loss. Blankets are inspected, cataloged, and organized on laydown racks for rapid reinstallation.
  • Turbine Blanket Replacement & Upgrades: Direct replacement of damaged, water-logged, or oil-saturated OEM blankets with high-efficiency modern insulation cores (mechanically needled E-glass and silica aerogel composites).
  • Turbine Insulation Field Measurement & 3D Scanning: Rapid on-site technician dispatch for precise field measurement and digital templating of modified piping, newly installed valves, or custom casing geometry.
  • Emergency Turbine Insulation Fabrication: Rapid-response manufacturing facility in the USA capable of producing critical-path replacement blankets in 24 to 48 hours to keep your outage on schedule.
  • Turbine Insulation Reinstallation & Final Certification: Certified reinstallation ensuring tight closure seams, proper spring tension, zero thermal bypass, and full compliance with OSHA touch-temperature thresholds (< 140°F).

Inspection Cycle & Outage Scope Coverage

ATC provides tailored blanket systems and maintenance services mapped to specific OEM inspection intervals across heavy-frame and aeroderivative gas turbines as well as utility steam turbines:

Outage Event Typical Service Interval & Scope ATC Turnkey Outage Insulation Services
Combustion Inspection (CI Outage) 8,000 – 12,000 Operating Hours: Fuel nozzle servicing, transition piece inspection, and combustor can overhauls. Rapid combustion inspection insulation and CI outage insulation covers for fuel manifolds, crossfire tubes, purge valves, and combustor casing access panels.
Hot Gas Path Inspection (HGP Outage) 24,000 – 32,000 Operating Hours: Turbine nozzle stages, rotor bucket examination, and split-line casing lifting. Comprehensive hot gas path inspection insulation and HGP outage insulation blanket kits covering upper/lower casing halves, cooling air lines, and turbine shell penetrations.
Major Overhaul (Major Inspection) 48,000 – 64,000 Operating Hours: Full rotor unstack, diaphragm removal, alignment, and full auxiliary inspection. Complete turbine major inspection insulation and gas turbine major inspection insulation replacement packages covering 100% of casing, exhaust ducting, valves, and piping.
Steam Turbine Overhaul Planned minor and major turnarounds for HP, IP, and LP steam turbine cylinders and crossover piping. Specialized steam turbine outage insulation, steam turbine major outage insulation, steam chest covers, stop/control valve blankets, and gland steam piping insulation.
Emergency Forced Outage Unplanned shutdowns triggered by casing hot spots, steam/fuel leaks, fire damage, or vibration failures. Expedited emergency turbine insulation, emergency insulation repair, and expedited 24/48-hr manufacturing for damaged turbine insulation replacement.

Turbine Equipment Models Supported During Outages

ATC maintains an expansive archive of CAD patterns and dimensional data across major OEM turbine fleets, enabling rapid blanket fabrication without waiting for OEM lead times:

Turbine OEM & Family Supported Frame & Aeroderivative Models Target Outage Insulation Coverage
GE Heavy-Frame Gas Turbines GE 7FA, 7FA.03, 7FA.04, 7FA.05, 6FA, 9FA, Frame 7E, Frame 9E, 7HA, 9HA Casing split lines, transition ducts, exhaust frame cooling lines, false start drain valves, and DLN fuel lines.
Siemens & Westinghouse 501F, W501F, 501D5A, SGT6-5000F, SGT-800, SGT-700, SGT-400, SGT-9000HL Compressor bleed valves, turbine cylinder covers, exhaust manifold plenum blankets, and steam injection piping.
GE Aeroderivative Turbines LM6000 (PC, PF, Sprint), LM2500, LM2500+, LMS100, TM2500 mobile fast power High-temperature casing blankets, radial/axial exhaust ducts, SPRINT water injection lines, and package enclosure panels.
Utility & Industrial Steam Turbines GE, Westinghouse, Toshiba, Mitsubishi, Alstom, Elliott, Dresser-Rand High-pressure (HP) and intermediate-pressure (IP) turbine shells, steam chests, main stop valves, governor valves, and crossover piping.

Engineering Advantages of ATC Outage Insulation Services

Choosing Advanced Thermal Corp. as your dedicated turnkey turbine insulation partner delivers measurable operational and cost advantages:

  • Permanently Stamped SS ID Tags: Every blanket piece features an embossed 316 stainless steel nameplate displaying equipment tag, section description, drawing reference, and sequential installation number for error-free laydown and reassembly.
  • Quick-Release Fastening Systems: Heavy-duty stainless steel spring latches, lacing hooks, and high-temp D-rings allow blankets to be stripped in hours without damaging fabrics or cutting wires.
  • Enhanced Thermal & Touch Safety: Designed to meet OSHA 1910.147 personnel protection guidelines (< 140°F / 60°C touch temp) and eliminate hot spots that degrade neighboring electrical cables, sensors, and actuators.
  • Zero Asbestos / High Purity: All materials are 100% non-combustible (ASTM E136), free from asbestos, and non-hazardous to technicians during removal and handling.

Request Expedited Outage & Turnaround Insulation Support

Facing an upcoming plant outage or need emergency replacement blankets right now? Advanced Thermal Corp. is on call 24/7 to support your turbine maintenance team. Contact our outage engineering group today for immediate turnaround pricing, field dispatch, or drawing review.

Submit Emergency Outage RFQ >>
Call Engineering Dispatch

About Us


Advanced Thermal Corp. designs and manufactures reusable and removable industrial insulation blankets, jackets and covers.
Learn more about our company.

Products


Stay current with the latest insulation covers, blankets, and jackets.

ATC Global Terms and Conditions of Sales and Services

Follow Us:


ATC Standard Terms and Conditions of Purchase

Main Office


Advanced Thermal Corp.
555 Pierce Rd,
Suite 200, Itasca, IL 60143.
P: 630-595-5150

E: admin@atcri.com

Request for Quote

All Rights Reserved © | Advanced Thermal Corp. | Over 30 years of manufacturing reusable and removable industrial insulation covers and blankets,