• : 630-595-5150
  • : admin@atcri.com
  • Home
  • About Us
  • Products
  • Tools and Forms
  • Request a Quote
  • Contact Us
  • Customer Login
  • Hiring Sales Reps

Thermal Insulation Covers for Nuclear Plants: Outside Containment

Advanced Thermal Corp > Thermal Insulation Covers for Nuclear Plants: Outside Containment

Thermal Insulation Covers for Nuclear Plants: Outside Containment

Thermal Insulation Covers for Nuclear Plants Outside Containment

Nuclear Plant Removable Insulation Covers Outside Containment - S.L.I.M. Penetration System

Over 30 Years of Specialized Removable Insulation Engineering for the Commercial Nuclear Power Fleet.

Advanced Thermal Corp. (ATC) has been engineering, patterning, and fabricating custom removable insulation covers for the commercial nuclear power generation industry for more than three decades. Today, we service the largest nuclear utility operators and fleet producers across the United States and Canada.

Our two strategically located domestic manufacturing plants enable ATC to support multiple nuclear plant refueling outages simultaneously. We deliver precision-measured, utility-grade removable insulation blankets on-time, on-budget, and manufactured to rigorous nuclear quality assurance standards—helping plant operators shorten critical-path outage downtime and ensure radiation safety.

» Download our Technical Guide: Removable & Reusable Insulation Covers for the Nuclear Industry (PDF)


Delivering on the Nuclear Promise

Advanced Thermal Corp. is the industry-leading removable and reusable insulation manufacturer with proven, direct field experience supporting nuclear refueling outages alongside utilities, operations teams, and outage specialty contractors. Every project is collaboratively engineered to eliminate delays:

  • Zero RAD-Waste, Once Installed: Removable blanket systems eliminate single-use fibrous or calcium silicate waste that requires costly rad-waste disposal drums.
  • Improved Industrial & Thermal Safety: Touch temperatures engineered below OSHA limits (≤ 140°F / 60°C) protect maintenance crews in confined auxiliary compartments.
  • Faster Installation & Removal Times: High-grade stainless steel draw-buckles and lacing rings enable unlacing in minutes without destructive cutting tools.
  • Reduced Radiological Exposure (ALARA): Rapid de-insulation and instant re-attachment sharply reduce technician stay-times in radiological zones.
  • Exceptional Fit & Quality: Standardized digital patterning achieves an industry-leading .001% misfit rate, preventing outage delays.
  • Rapid Repeat Replacement: Permanent asset tagging ensures rapid one-call reordering if a blanket is contaminated or damaged.
Nuclear Power Plant Removable Thermal Insulation Covers for Piping, Valves, and Flanges Outside Containment

Nuclear Refueling Outage Removable Insulation Field Support and Fast Turnaround Fabrication

Nuclear Refueling Outage Lifecycle Execution

Comprehensive knowledge of nuclear refueling outage staging allows ATC to support nuclear stations through every phase—from initial pre-outage scope definition to post-outage recommissioning:

Pre-Outage Planning Stage

  • Generate detailed takeoff estimates and fixed budgeting for total outage insulation scope.
  • Manufacture and deliver standardized fitting covers (flanges, valves, elbows) in advance of breaker trip.

During-Outage Execution Stage

  • Rapid 1-to-3 Day Turnaround: On-site measurement or laser scanning with express fabrication and hot-shot delivery for unexpected insulation needs.
  • Custom Engineering for Special Clearances: Fabricate blankets outside standard dimensions to accommodate structural interferences, pipe supports, or tracer lines.
  • 24/7 Weekend & Holiday Production: Uninterrupted shop shifts dedicated to meeting scheduled plant start-up deadlines.
  • Unescorted Badged Personnel: Field specialists maintaining active nuclear badges year-round for immediate deployment to outage and non-outage work.
  • Quality Walk-Downs: Post-installation verification walks to inspect fit, thermal sealing, and mechanical clearance.

NRC Regulatory Guide 1.36 Compliance & Quality Assurance

Nuclear plant piping and safety systems outside containment require materials of construction that rigorously prevent stress corrosion cracking (SCC) of austenitic stainless steel:

  • NRC Regulatory Guide 1.36 Qualified: Fully certified and batch-tested insulation materials and jacketing meeting strict leachable chloride, fluoride, and silicate threshold limits.
  • Near-Zero Rework Metric: Stringent in-process inspections ensure fit fidelity with a rework rating approaching zero.
  • Individual Asset Mapping: Every blanket includes permanent, riveted stainless steel identification tags corresponding to isometric P&IDs and component tags.
  • Radiation & Chemical Resistance: Engineered cold-face fabrics resist radiological decon wash solutions, chemical spills, and high humidity in auxiliary turbine buildings.
NRC Regulatory Guide 1.36 Compliant Removable Stainless Steel Insulation Blankets for Nuclear Facilities

Request Nuclear Plant Outage Insulation Support

Planning an upcoming nuclear refueling outage or require emergency turnaround replacement covers? Contact Advanced Thermal Corp for immediate engineering and plant support.

Request Nuclear Blanket Quote » Call Engineering: (770) 446-7140

About Us


Advanced Thermal Corp. designs and manufactures reusable and removable industrial insulation blankets, jackets and covers.
Learn more about our company.

Products


Stay current with the latest insulation covers, blankets, and jackets.

ATC Global Terms and Conditions of Sales and Services

Follow Us:


ATC Standard Terms and Conditions of Purchase

Main Office


Advanced Thermal Corp.
555 Pierce Rd,
Suite 200, Itasca, IL 60143.
P: 630-595-5150

E: admin@atcri.com

Request for Quote

All Rights Reserved © | Advanced Thermal Corp. | Over 30 years of manufacturing reusable and removable industrial insulation covers and blankets,